Please read article, cited after the quote. Articles open in a new window.
TIVERTON — The Bruce Power nuclear generating station has shut down one of its reactors.
The problem isn’t mechanical — it’s because there isn’t enough demand for the electricity generated by the station.
Spokesperson Steve Cannon says the manufacturing slowdown caused by the recession and a cooler summer have left Bruce Power with a surplus
http://lfpress.ca/newsstand/News/Local/2009/07/18/10176756-sun.html
Filed under: Indigenous, Nuclear Waste, Shundahai Network Blog, enivornment, nuclear, nuclear weapons | Tagged: Reactor shut down over lack of demand
Stumble It!




